1
عمران::
هزینه سرمایهای کل
Then, the total capitalized cost for the bridge is:
The total capitalized cost of the embankment option is the first cost "X" (un-known) plus the present worth of all future annual maintenance costs, or:
The total capitalized cost of the embankment option is, therefore, X + $75,000.
واژگان شبکه مترجمین ایران